Learn about the ongoing 公共工程 and 设施 repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Alligator Creek Maintenance Dredge
Last Updated: 09/06/2024 类别:沿海 当前阶段: 设计开发
设计, 许可证, 疏浚, and construction oversight for project certification of a maintenance 疏浚 event of Alligator Creek channel.
Last Updated: 09/06/2024 Category: 县设施 Category: 已缴纳的销售税 当前阶段: Planning and Project Approval
Construct a new fire station at a location to be determinded, replacing the old fire station. New fire station will generally conform to a new prototype design for new and replacement stations. Includes land acquisition for station to be located nearby present location.Last Updated: 09/06/2024 Category: 县设施 Category: 已缴纳的销售税 当前阶段: Planning and Project Approval
Construct a new 火 Station at a location to be determinded, replacing the old fire station. Includes land acquisition for station to be located nearby present location.Last Updated: 09/06/2024 Category: 公园 And 娱乐 Category: 已缴纳的销售税 当前阶段: 设计开发
GC Herring Phase I design and construction. Redevelopment of the park will include necessary amenities for a community park as identified in the 公园 and 娱乐 master Plan.Gulf Cove Interior Canal design and maintenance 疏浚 project
Last Updated: 09/06/2024 类别:沿海 当前阶段: 设计开发
Gulf Cove Interior Canal bathymetric survey and design project to -4'MLW. Gulf Cove Waterway MSBU requested work.Mid-County Library Hurricane Repairs
Last Updated: 09/06/2024 Category: 县设施 当前阶段: 建设
Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy.NWPC Interior Canal Maintenance Dredge
Last Updated: 09/06/2024 类别:沿海 当前阶段: Turnover and Closeout
Northwest Port Charlotte waterway maintenance 疏浚 design project. 设计, plan, and 许可证 a limited 疏浚 project for the MSBU.Last Updated: 09/06/2024 类别:沿海 当前阶段: 设计开发
设计, 许可证, and construct a maintenance 疏浚 event within the Pirate Harbor waterway system. This project will include construction oversight with post 疏浚 bathymetric surveys for project certification. This project is for approximately the landward half of the access channel inland connector canals. The finger canals are not included in this project.